“Any modification to an existing RE system shall require the QE to undergo the same process as that of a new customer.”
ERC Resolution No. 15, s. 2025, net-metering rules §12. The agreement template adds: “including the execution of a new Net-Metering Agreement.”
Adding generating capacity or replacing generating equipment “requires the approval of CEBECO I”.
CEBECO I net-metering application form
Adding a battery or swapping the inverter plausibly counts as a modification. The same rules confirm that systems qualify “with or without battery” (§6), so storage doesn’t cost you net metering. How VECO, MECO and the CEBECOs handle battery retrofits in practice isn’t published, so confirm it with your utility before work starts.
The process limits are short on paper: 3 working days for the LGU electrical permit and 7 for the CFEI, then 10 working days at the utility while the energy emergency under EO 110 lasts (20 under the rules otherwise). Those are legal limits, not promises; real timing depends on complete documents. Not net-metered yet? Start with our net-metering guide for Cebu.
Why a battery matters in Cebu now
Cebu’s 2026 red-alert windows mostly ran into the evening, when panels produce little. A battery fills that gap. Without one, a grid-tie system shuts down in any outage, even at noon.
123Grid alerts, 1 Jan–3 Sep 202693 yellow and 30 red on the Visayas grid (NGCP, via Daily Tribune)
≈1 hPer rotation, per areaVisayan Electric rotations, May 2026
3–9 hRed-alert windowsMostly late afternoon and evening, May–Sep 2026
2028When the fix is expected“It will be a 2028,” Energy Secretary Garin (SunStar, 12 Oct 2026)
SunStar’s report of the October 2026 Cebu energy summit said the Visayas will likely keep facing supply shortages through 2027.