| Electrical upgrades | An old main panel or breaker, an undersized service entrance, no space for new breakers. | Does my main panel or service entrance need work, and is it priced? | Reviewed before a final quote; not in the instant estimate. |
|---|
| Roof repairs | Rusted sheets, weak purlins, leaks, or a roof due for replacement during the system’s life. | Does my roof need work first, and who does it? | Not included; checked at the site assessment. |
|---|
| Access and scaffolding | Two- and three-storey houses, steep or fragile roofs. | Is scaffolding or special access included? | Not a separate line; site-specific costs are reviewed before a final quote. |
|---|
| Travel and logistics | Islands and towns far from the installer’s base. | Is there a travel or logistics charge for my town? | One price list across Cebu in the instant estimate; any travel or island logistics cost is confirmed in your proposal. |
|---|
| Monitoring | Wi-Fi data loggers, apps or cloud subscriptions. | Are there monitoring fees, now or later? | Not priced separately; ask what the set-up includes. |
|---|
| Permit and utility fees | Electrical permit and CFEI (set locally), ERC ₱1,500, meter difference up to ₱3,000. | Which fees does the price cover, and which do I pay directly? | Paperwork allowance inside “Installation, permits & net-metering”. |
|---|
| VAT | Prices quoted without saying whether VAT is included. | Is VAT included in every line? | Not stated in the instant estimate; ask for VAT treatment in writing. |
|---|
| Adding a battery later | Grid-tie inverters, which can’t run a battery. One installer’s guide puts an inverter change at ₱30,000–₱80,000. | Can this inverter take a battery later, or would it need replacing? | Every configuration uses a Deye hybrid inverter, so it is battery-ready. |
|---|
| Utility paperwork for later changes | Adding storage or changing the inverter after approval goes through the utility again. | Who handles the utility paperwork if I add a battery later? | The original system’s paperwork is in the estimate; later changes are quoted then. |
|---|