Home solar installation in Cebu, from site visit to after-sales.
We assess your roof, design the system from your own bills, handle the permits, install and test it, file your net metering and support you after handover. Deye hybrid inverters, 620 W N-type TOPCon panels and 5.12 kWh LiFePO4 batteries, priced line by line.
After sunset the battery carries the backup circuits; by day the panels power the house and refill it.
Solar energy
Battery backup
Illustration
The short answer
Choose an installer who visits before fixing the price, sizes the system from your bills, itemises the quote with model numbers you can check, has the electrical plans signed and sealed by a Professional Electrical Engineer (RA 7920 requires it), secures the LGU electrical permit, tests and configures the system, and files net metering with VECO, MECO or your CEBECO co-op.
Cheap Solar Cebu’s process covers each of those steps for homes across Cebu; permits and net-metering paperwork are in the itemised estimate. We don’t promise an installation time before seeing your roof: the schedule is confirmed in your proposal.
CHOOSING AN INSTALLER
Who can install solar reliably on your home? One who shows the work.
Roof structure, shade and your main panel can’t be judged from a satellite image or a phone call.
Our processEvery quotation follows a site assessment. The online estimate is a starting point, not the contract price.
02
Sizing from your own bills
An oversized system costs more than it saves; an undersized one leaves savings unclaimed.
Our processPanels are counted from your yearly kWh and the roof space we measure; batteries from your evening use and the circuits you want on.
03
Named equipment, priced line by line
Model numbers let you read the datasheets and compare like with like.
Our processThe Deye inverter model, the panels, the battery, mounting and installation are each a priced line.
04
Sealed plans and an electrical permit
RA 7920 requires electrical plans signed and sealed by a Professional Electrical Engineer, and a permit, before any installation.
Our processPermit paperwork is part of the itemised estimate. Ask to see the electrical plans, signed and sealed by the Professional Electrical Engineer, before work starts.
05
Protection that is listed, not implied
Isolators, surge protection, breakers and earthing are what make a system safe to live with.
Our processAsk for the protection fitted to be listed in your proposal. We don’t claim anything that isn’t fitted.
06
Testing and settings you can see
A system not configured for your battery and the 60 Hz grid isn’t finished, however neat the roof looks.
Our processWe test, configure and set up monitoring before handover, then walk you through it.
07
Net metering filed, support in writing
Export credits start only after the utility approves. Support terms belong on paper, not in a chat.
Our processNet-metering paperwork is included. After-sales terms are confirmed in your proposal.
A short form, then a call to agree a visit. No obligation.
THE INSTALLATION JOURNEY
From first call to after‑sales, chapter by chapter.
Who does what at each step, and the legal clocks that apply. Prefer the short version? See how it works.
From first call to after-sales
01 / 07
Your home, step by stepSeven chapters
Before the visit: a bare roof, a monthly bill and a list of priorities.
Solar energy
Battery
Grid
Illustration
Chapter 01
Before anyone visits
We start with your bills and what you want solar to do.
Tell us your usual monthly bill, your utility and your priority: lower bills, brownout backup, or both. The calculator on this page gives you an itemised first estimate in pesos before you share any contact details.
The online estimate is instant. When you request a quote, we call to agree a visit date.
We take care of
An itemised first estimate, then a call to book a site visit at a time that suits your household.
Your part
Find recent bills, ideally 12 months so aircon-heavy months count, and think about what must stay on in a brownout.
✓A first estimate and a booked visit, with no obligation.
Chapter 02
On site · roof, wiring, space
We measure what an estimate can’t see.
Every roof face and its pitch, the purlins or rafters under the sheets, shade from trees and neighbours through the day, the main breaker and its spare ways, the earthing, and the wall where the inverter and battery would live. We also note the meter, the cable route, your Wi-Fi signal and the transformer that limits how much solar the utility can accept.
Booked at a time you choose. Use the checklist below to prepare.
We take care of
Measuring, photographing and recording the roof, structure and electrics, and flagging any repair needed before panels go up.
Your part
Safe access to the roof and main panel, and a walk-through of the circuits you want backed up.
✓A site record the design and the final price are built on.
Chapter 03
On paper · sized to your home
A layout, a single-line diagram and an itemised price.
Panels are counted from your yearly kWh and the roof space we measured, keeping clear of edges and vents. The inverter is matched to the array and your peak load; the battery to your backup circuits. Your proposal shows the roof layout and every line item, with the Deye inverter model named, and a single-line diagram is drawn for your house.
Philippine law then requires the electrical plans to be signed and sealed by a Professional Electrical Engineer, and an LGU electrical permit, before installation starts.
Legal limit: the LGU acts on the electrical permit within 3 working days of complete documents and payment (JMC 001 s.2026).
We take care of
The design, the itemised proposal and the permit paperwork for your city or municipality.
Your part
Review the scope, ask anything, sign the application forms and approve the design.
✓An approved design, and a permit before work starts.
Chapter 04
On the roof · the part that holds
Rails fixed into the structure, not just the sheet.
In strong winds, rooftop systems tend to fail at clamps and fasteners rather than at the panels. So rails are fixed through the roof sheet into the purlins or rafters with sealed fasteners and kept back from the edges, and panel clamps go only where the panel maker’s manual allows, tightened to the specified torque.
Installation days depend on the roof and the system size. We confirm the schedule in your proposal.
We take care of
Mounting suited to your roof type, with every roof penetration sealed against leaks.
Your part
Keep the area below the roof edge clear, and let close neighbours know about the work.
✓A mounting structure tied into your roof’s frame.
Chapter 05
On the wall · inverter, battery, protection
Panels, inverter, battery and every protection device.
Panels are wired in strings to the Deye hybrid inverter through a DC isolator and surge protection. The battery connects through its own DC breaker, and the circuits you chose move to a backup sub-panel. The inverter goes on a shaded, ventilated wall above flood level, because it derates above 45 °C.
Expect one scheduled power interruption while we connect to your main panel; we agree the time with you.
We take care of
Installing and labelling every cable run, and fitting the protection devices listed in your proposal.
Your part
Plan around the agreed power interruption, and keep children and pets away from the work area.
✓Hardware installed, labelled and ready to test.
Chapter 06
Switch-on · tests, settings, paperwork
Tested, configured, then filed with your utility.
Before switch-on we check polarity, string voltages, earthing and every breaker. The inverter is set for the Philippine 60 Hz grid and your battery, the backup changeover is tested by cutting the grid supply, and monitoring is set up on your Wi-Fi. Grid-connected operation waits for the utility’s approval; the CFEI and your net-metering application go in next.
Legal limits: CFEI within 7 working days (3 while EO 110 is in force); utility processing within 20 working days, or 10 under EO 110. The impact study and the utility’s testing are free.
We take care of
Commissioning tests, inverter and battery settings, the monitoring app, and the CFEI and net-metering paperwork.
Your part
Sign the net-metering agreement and settle utility-side fees: ₱1,500 for the ERC certificate, and any meter difference (capped at ₱3,000 for homes). Your proposal says which fees it covers.
✓A tested system, and export credits once the bidirectional meter is in.
Chapter 07
Evening one, and the years after
Your documents, your app, and support after handover.
At handover we walk you through the monitoring app, show what the backup sub-panel covers in a brownout and what it doesn’t, and hand over your documents: copies of the electrical plans, permit and CFEI copies, net-metering papers, datasheets, serial numbers and warranty documents.
After-sales support continues once the system is running. Its terms, and every warranty term, are confirmed in your proposal.
We take care of
Answering system questions and looking into monitoring alerts or faults, on the terms in your proposal.
Your part
Keep the app connected, keep the panels clear of debris, and contact us through the form on this page before anyone climbs the roof after a storm.
✓A system you understand, with support after handover.
Durations shown are legal maximums for permits and utilities, not promises. Installation days are confirmed in your proposal.
SITE ASSESSMENT
What we check at the site visit.
Twelve checks in three places. Each one changes the design, the price or the safety of the system. Want a head start? Read is my roof suitable for solar.
On the roof
Faces, pitch and areaAbout 6 m² of roof per kWp. At Cebu’s latitude a 15° east or west face loses about 2–4% against the best face, and a flat roof about 1% (PVGIS).
Structure and fixingsPurlin or rafter size and spacing, fastener condition and roof age. The roof should outlast the system on it.
Shade through the dayTrees, water tanks, parapets and neighbouring floors, from morning to late afternoon.
Edges and walkwaysPanels kept about a metre back from eaves, ridges and corners, where wind uplift is strongest, unless the engineer’s calculation allows otherwise.
At your electrical panel
Main breaker and spare waysTheir ratings decide how the inverter connects and where the backup sub-panel is fed.
EarthingWe check the existing earth electrode and plan how frames, rails and equipment bond to it.
Backup circuitsWhich circuits move to the backup sub-panel, and whether their start-up surges fit the inverter and battery.
Meter and service entranceWhere the utility’s bidirectional meter will go, and the state of the service line into the house.
Around the house
Inverter and battery wallShaded, ventilated, above flood level and close to the main panel. Deye’s datasheet lists IP65 and derating above 45 °C.
Cable routeThe shortest safe path from roof to inverter, in conduit and away from where people walk.
Wi-Fi at the inverterSignal where the inverter will hang, so the monitoring app keeps reporting.
Transformer and coastlineYour transformer’s net-metering hosting limit, and distance to the sea: Jinko’s manual, for example, asks for extra connector protection from 50 to 500 m of the shore.
BEFORE THE VISIT
Get your home ready for the site visit.
Tick what you have, choose what must stay on in a brownout, then print the list or send it with your quote request. Nothing leaves this page unless you ask.
Site-visit preparation checklist
Printable · nothing is sent unless you request a quote
A single-line diagram like this one is drawn for your house. The electrical plans filed for your permit are signed and sealed by a Professional Electrical Engineer, as RA 7920 requires.
Illustration A simplified diagram, not a design. The single-line diagram drawn for your house shows the actual cable sizes, breaker ratings and protection devices; the electrical plans filed for your permit are signed and sealed by a Professional Electrical Engineer.
Sized from your bills
We size from kWh, not the peso total, because Cebu rates moved by ₱0.50–₱1.00/kWh in a typical month in 2025–26. A system aimed at lower bills covers about 70% of a year’s use at a cautious 1,350 kWh per kWp; a backup system covers more and adds batteries for the evening.
Laid out for your roof
Each 620 W panel takes about 2.7 m². The layout works around vents, edges and shade, and the inverter is normally chosen with room for at least 20% more panels than we install, so the system can grow.
Backup by circuit
In a brownout the grid-tied side must shut down. Only circuits on the inverter’s backup port stay on, so we agree them with you. One battery gives about 7 hours of essentials; with an aircon on backup we plan two. More in the battery backup guide.
The Visayas grid logged 93 yellow and 30 red alerts from 1 January to 3 September 2026 (NGCP, via Daily Tribune).
In pesos
For a ₱8,000 monthly bill at VECO’s Sep 2026 rate (₱14.89/kWh), our calculator suggests 6 panels (3.72 kWp) for about ₱145,000–₱170,000 battery-ready, or 7 panels with 1 battery for about ₱210,000–₱246,000. The itemised list prices are ₱157,200 and ₱227,900 before any promotion; the band allows for what the site visit confirms. VAT treatment is confirmed in your proposal. What moves the price · Compare packages
EQUIPMENT AND WORKMANSHIP
What gets installed, and what we don’t claim.
One inverter family, one panel and one battery, plus the protection around them. Here is each piece and where it comes from, so nothing is implied that isn’t fitted.
A standard home system, piece by piece
Component
What it does
In your estimate
620 W N-type TOPCon panels
Make the DC power. The count comes from your kWh and roof space.
IncludedPriced per panel. Ask for the panel datasheet with your proposal.
Deye hybrid inverter (SUN-5K/6K-SG04LP1 or SUN-8K/10K-SG05LP1)
Converts solar to household AC, charges the battery and runs the backup circuits. Deye lists anti-islanding protection (IEC 62116).
IncludedSingle-phase 48 V, normally chosen with room for at least 20% more panels.
5.12 kWh LiFePO4 battery
Stores daytime solar for the evening and brownouts. About 3.69 kWh delivered per battery on our cautious planning basis.
With backupPriced per battery when your goal includes backup. More may be added later; we confirm compatibility with your battery model and your utility.
DC isolation and surge protection
Isolates the array for service and limits lightning and switching surges. The PEC, as transcribed (Sec. 6.90.4), calls for accessible, labelled DC and AC disconnects.
IncludedDeye’s 8/10 kW SG05LP1 datasheet lists a built-in DC switch and Type II surge protection on DC and AC; for 5/6 kW models the protection fitted is listed in your proposal. The mounting, cabling and protection line adds breakers and an SPD.
Breakers
Protect each cable run, on the DC side and in the house wiring.
IncludedIn the mounting, cabling and protection line.
Backup sub-panel
Separates the circuits that stay on in a brownout from the rest of the house.
Only if listedWhen your goal includes backup. Not a separate line in the online estimate; your proposal lists it.
Earthing and bonding
Ties panel frames, rails and equipment to earth so a fault trips a breaker instead of energising metal. The PEC, as transcribed (Art. 2.50), requires metal parts and PV supports to be grounded.
IncludedPart of the installation. The existing earth electrode is checked at the site visit.
Arc-fault detection (AFCI)
Detects DC arcing. Listed as optional on Deye’s SG05LP1 datasheet.
Only if listedOnly if your proposal lists the AFCI-enabled variant. Ask; we don’t claim it otherwise.
Module-level rapid shutdown
Lowers rooftop DC conductors to 30–80 V within 30 seconds. PEC 2017 Sec. 6.90.2.6, as transcribed, requires it for PV circuits on buildings; to be confirmed against the official IIEE text.
Not standardNot in the standard online estimate. Your Professional Electrical Engineer confirms how Sec. 6.90.2.6 applies to your roof; any devices it requires should be a priced line in your proposal before you sign.
Ask for the datasheet of every model you are quoted. Warranty terms for each component are confirmed in writing in your proposal.
Workmanship on a Cebu roof
The details that decide how a system rides out a typhoon season. Your proposal states them for your roof; the typhoon-ready installation guide explains why each matters.
01Fixed to the structure
Rails go through the roof sheet into purlins or rafters with sealed fasteners, never into the sheet alone.
02Clamps in the maker’s zone
Panel clamps sit only where the panel’s installation manual allows; elsewhere its load rating no longer applies.
03Torque, not guesswork
Clamp and rail bolts are tightened to the specified torque. In storms, loosened clamps fail before panels do.
04Edges kept clear
About a metre back from roof edges and corners unless the engineer’s calculation allows otherwise.
05Coastal hardware
Near the sea, stainless fasteners and protected connectors. Jinko’s manual, for example, sets 50 m as a minimum distance from the shore.
06A cool, dry inverter wall
Shaded, ventilated and above flood level, with the battery beside it and every cable labelled.
PERMITS AND APPROVALS
The paperwork, and its legal clocks.
Permit and net-metering paperwork is part of the itemised estimate. The times below are legal maximums for government offices and utilities, not promises of a date.
Sealed plans
A single-line diagram and electrical plans, signed and sealed by a Professional Electrical Engineer (RA 7920, Sec. 31(a) and 34).
LGU electrical permit
Filed with your city or municipality before installation. Fees are set by each LGU.
Installation
Built to the Philippine Electrical Code and the approved plan. No grid-connected operation before the utility approves.
CFEI
The Certificate of Final Electrical Inspection, issued after installation.
Utility application
The ERC limits what the utility may require to four items: application form, CFEI, amended net-metering agreement and the certificate fee. Its impact study and testing are free.
Meter and certificate
The utility fits a bidirectional meter (homes pay at most ₱3,000 difference) and sends your papers to the ERC within 5 days of signing. Credits start from testing and commissioning.
The paperwork clock
Maximum working days allowed by law
LGU electrical permit3working days
Before installation, from complete documents and payment. DOE-DILG-DPWH JMC 001 s.2026
Certificate of Final Electrical Inspection (CFEI)7working days
After installation. 3 working days under the 2026 energy-emergency advisory. JMC 001 s.2026; DOE advisory, 1 Apr 2026
Utility net-metering processing20working days
From your complete application to the utility. 10 working days under the 2026 energy-emergency advisory. ERC Res. 15 s.2025 §20; DOE advisory under EO 110
Standard legal limit
While EO 110 is in force
EO 110 runs to about 24 March 2027 unless extended or lifted. Real timing depends on complete documents and the utility’s impact study.
Building permits and structural sign-off
Whether rooftop solar also needs a building permit or a structural engineer’s sign-off is set by each city’s Office of the Building Official, so it is confirmed for your address. Net-metering steps differ slightly by utility: see the net metering guide or your utility’s guide for VECO, MECO or CEBECO.
HANDOVER AND AFTER-SALES
What you receive at handover, and what comes after.
Your handover pack
The full list is confirmed in your proposal.
Copies of the electrical plans and single-line diagram filed for your permit
LGU electrical permit and CFEI copies
Net-metering application, agreement and the ERC certificate once issued
Datasheets and serial numbers for panels, inverter and battery
Manufacturer warranty documents (terms confirmed in your proposal)
Commissioning record: test results and inverter settings
Backup sub-panel schedule: which circuits stay on
Monitoring app set up on your phone
Shutdown and brownout instructions posted by the inverter
After-sales support
Solar runs quietly for years, but questions come up: a monitoring alert, a breaker that tripped, a plan to add a battery or an aircon. After handover you deal with us directly.
System questions and help reading the monitoring app
Looking into monitoring alerts and faults
Post-storm checks before the system restarts (terms in your proposal)
Response times, coverage and every warranty term are confirmed in your proposal, in writing.
After a storm
Stay off the roof. Panels stay live whenever there is daylight, even with the grid down. Contact us through the form on this page so a check can be arranged before the system restarts, on the terms in your proposal. A yearly check of clamp torque is good practice.
SERVICE AREA BY UTILITY
Home solar across Cebu, utility by utility.
Your utility sets your rate, your export credit and your net-metering steps. Lapu-Lapu and Cordova are MECO, not VECO. We confirm availability and the visit date for your address.
VECO (Visayan Electric)
₱14.89/kWh Sep 2026
Cebu City · Mandaue · Talisay · Consolacion · Liloan · Minglanilla · Naga · San Fernando
Its published guide allows solar of about 30% of your transformer’s kVA (a 25 kVA unit hosts about 7.5–8 kW).
Rates are each utility’s all-in residential rate for the month shown: VECO, MECO and CEBECO I as published; CEBECO III computed at 100 kWh from its published schedule; CEBECO II from the ICSC PRESYO tracker (±₱0.30). Hosting limits are the utilities’ published guides for single-phase transformers; the final figure comes from the utility’s impact study.
STRAIGHT ANSWERS
Questions homeowners ask before booking.
Straight answers on cost, timing, permits, brownouts and support.
See real work first
The house on this page is an illustration, not a customer’s home, and we don’t show testimonials we can’t verify. If you’d like to see an installation before deciding, ask to see a recent one near you.
It depends on your bill, your roof and whether you want a battery, so the final price follows a site assessment of your roof and wiring. As a guide, a battery-ready system for a ₱8,000 monthly bill at VECO’s Sep 2026 rate is about ₱157,200 on our itemised estimate (list price before any promotion).
The calculator on this page gives your own itemised figure in about 30 seconds, and our solar installation cost guide breaks the price down by system size.
02How long does a home solar installation take in Cebu?
We don’t promise an installation time before seeing your roof; the schedule is confirmed in your proposal. The paperwork has legal limits: 3 working days for the LGU electrical permit once documents are complete and fees paid, 7 for the CFEI (3 while the EO 110 energy emergency is in force), and 20 working days for the utility’s net-metering processing (10 under EO 110).
Real timing depends on complete documents and the utility’s impact study, so treat these as maximums, not a promised date.
03Do I need a permit to put solar panels on my house?
Yes. Under RA 7920, electrical plans must be signed and sealed by a Professional Electrical Engineer and a permit secured before installation. You need an LGU electrical permit before work starts and a Certificate of Final Electrical Inspection (CFEI) after it; the CFEI is also one of the documents for net metering.
Some cities may also ask for a building permit for rooftop solar. That is confirmed with your Office of the Building Official. Permit paperwork is part of our itemised estimate.
04Will solar keep my lights on during a brownout?
Only with a battery, and only on the backup circuits. When VECO, MECO or CEBECO power drops, a grid-connected inverter must stop feeding the grid so line crews stay safe. A hybrid inverter with a battery disconnects from the grid and keeps a separate backup sub-panel running.
One 5.12 kWh battery gives about 7 hours of essentials such as a fridge, lights, fans and Wi-Fi (an estimate with no solar recharge). With an aircon on backup we plan two batteries.
05Can you install on a metal roof or a concrete deck?
Usually, yes. On GI or long-span metal, rails are fixed through the sheet into the purlins or rafters, never to the sheet alone. On a concrete deck, frames are mechanically anchored to the slab and the penetrations waterproofed. Tile roofs need hooks fixed to the rafters or battens per the racking maker’s manual; we confirm at the visit whether your tile roof is suitable.
The site visit checks the structure, the roof’s age and condition, and any repairs worth doing before panels cover them.
06Which areas in Cebu do you install in?
Homes across Cebu, including Cebu City, Mandaue, Talisay, Consolacion, Liloan and Minglanilla (VECO), Lapu-Lapu and Cordova (MECO), and towns served by CEBECO I, II and III. Share your barangay when you request a quote and we’ll confirm your utility and availability for a site visit.
07Should I plan for a battery even if I start without one?
It helps. Every system we quote uses a Deye hybrid inverter, so it is battery-ready, and choosing your backup circuits at the site visit lets the backup sub-panel be planned from the start.
Utilities are likely to treat adding a battery as a modification: under ERC Res. 15 §12 a modification follows the same process as a new application, so the utility is told first. Our battery upgrade guide covers the steps.
08What happens after installation if something goes wrong?
You can come back to us for system questions, monitoring alerts and faults. The monitoring app shows what the system is doing, and your handover pack lists equipment serial numbers and warranty documents.
After-sales and warranty terms are confirmed in writing in your proposal. After a storm, stay off the roof and contact us through the form on this page: panels stay live whenever there is daylight.
THREE WAYS TO MOVE FORWARD
Ready for a site visit? Start here.
Request a quote and we’ll arrange a site assessment, run the numbers yourself first, or ask a question. No obligation either way.
Sec. 31(a) and 34: only a Professional Electrical Engineer may seal electrical plans; no installation without sealed plans and a permit. Approved 24 Feb 1995.
100 kW cap, 20-working-day utility processing (§20), free impact study (§17), modifications treated as new applications (§12), credits at the generation charge (§13). Issued 27 Aug 2025.
Forms, process, signed and sealed plans, and the hosting table (about 30% of transformer kVA, “for initial guidance only”). Undated; accessed 16 Oct 2026.
Model-specific clamp zones; 50 m minimum from the shore and connector protection from 50 to 500 m. Dec 2023. Cited as an example; your panel’s own manual applies.
Summarises PEC 2017 Art. 2.50 grounding of metal parts and PV supports, and Sec. 6.90.4 accessible, labelled DC and AC disconnects. 13 Nov 2025, updated 7 Mar 2026. Not the official IIEE text.
Transcribes PEC 2017 Sec. 6.90.2.6: controlled conductors to ≤30 V outside, or ≤80 V inside, the array boundary within 30 s. Dec 2022. To be confirmed against the official IIEE text.
CEBECO II September 2026 rate (tracker estimate, ±₱0.30), and the Jan 2025–Sep 2026 monthly rate series behind the typical monthly move of ₱0.50–₱1.00/kWh (VECO about ₱0.47, MECO about ₱0.97).
YOUR HOME, YOUR SYSTEM
A proper installation starts with a proper visit.
Tell us about your home and we’ll arrange a site assessment. You’ll get a design, an itemised proposal and the paperwork plan before anything is installed.