ROOF SUITABILITY · CEBU

Is my roof suitable for solar? A Cebu roof checklist.

Metal, concrete deck and tile roofs can all take solar, facing almost any direction at Cebu’s latitude. What decides it is space, shade, the strength of the roof and how many years it has left. Check yours in two minutes, then we confirm it on site.

  • No sign-up
  • Results before contact details
  • Site visit before any final price
Before any panels go upA visual guide
Illustration of a Cebu house with a bare roof in full sun, the roof highlighted, before any solar panels are fitted.
Every installation starts here: the bare roof, its space, slope, shade and structure.
  • Sunlight on the roof
Illustration
The short answer

Probably, if it has open space, little shade, a sound frame and years of life left. Plan on about 6.2 m² of open roof per kWp: a ₱10,000 monthly VECO bill (₱14.89/kWh, Sep 2026) suggests about 7 panels, roughly 27 m² of open roof on a simple roof (small or cut-up faces need more once a 1 m edge is kept clear). Direction matters little at Cebu’s latitude: east and west faces give only about 2–4% less a year than the best angle, a gentle north slope about 7% less.

The usual deal-breakers are heavy shade, a roof due for replacement, light materials, and missing permission from the owner or association. Each needs solving before solar makes sense.

01 · SPACE

How much roof does solar actually need?

Panels need open, unshaded roof with a clear margin at the edges. Here is the arithmetic our calculator uses, and where it falls short.

One of our 620 W N-type TOPCon panels measures 2.382 × 1.134 m, about 2.70 m². Not every square metre of roof can take one. Good practice keeps panels about 1 m back from eaves, ridges and gable edges, where wind uplift is strongest, unless the engineer’s calculation allows otherwise. Panels also work around vents, water tanks and shade.

For a roof you draw or type in, our calculator allows for all that by treating 70% of it as usable (where Google’s Solar API has your roof, it uses Google’s sunny-area estimate instead). That gives a planning figure of about 6.2 m² of open roof per kWp (4.4 m² of panel). On large, simple roofs it holds up well.

On a single face of a typical house, the clear edge takes a bigger share. The plan shows a 12 × 7 m face (84 m²) that fits 16 panels, fewer than the ratio suggests. That is why every quote follows a drawn layout from the site assessment, not a rule of thumb.

2.70 m²per 620 W panel2.382 × 1.134 m

≈6.2 m²of roof per kWpat 70% usable

1 mclear edgegood practice; estimate

Plan of a 12 by 7 metre roof face. Keeping a 1 metre strip clear at every edge leaves room for 16 panels of 620 watts, 9.92 kWp.12 m along the ridge7 m down the slope1 m kept clearRidge at the top · eave and gutter at the bottom

12 m along the ridge × 7 m down the slope, with 1 m kept clear at every edge (hatched).

Roof face
84 m²
Panels that fit
16
System size
9.92 kWp
Face covered
51%

Illustration, not a design. A plain 12 × 7 m face with a 1 m clear edge holds 16 panels laid landscape. The 70% rule of thumb would suggest 21, which is why the drawn layout, not a ratio, sets the final count.

Roof space for typical Cebu bills (estimates)
Monthly billPanelsPanel areaRoof to plan forAverage output
₱4,000≈ 269 kWh4*2.48 kWp11 m²≈ 15 m²≈ 280kWh/month
₱7,000≈ 470 kWh53.10 kWp14 m²≈ 19 m²≈ 350kWh/month
₱10,000≈ 672 kWh74.34 kWp19 m²≈ 27 m²≈ 490kWh/month
₱15,000≈ 1007 kWh116.82 kWp30 m²≈ 42 m²≈ 770kWh/month
₱20,000≈ 1343 kWh148.68 kWp38 m²≈ 54 m²≈ 980kWh/month

Estimates from our calculator’s solar-only sizing at VECO’s Sep 2026 rate of ₱14.89/kWh, with roof area at the 70% allowance; not a design. The solar-only option aims to cover about 70% of your yearly use. Output uses our cautious 1,350 kWh per kWp a year and varies by month. *4 panels is our smallest system. Prices for each size are in our solar installation cost guide and our solar packages.

Know your bill? The calculator sizes the system, checks it against your roof (draw it on the map or type its area) and shows an itemised price in about 30 seconds.

Estimate my system size and price

02 · YOUR ROOF

Check your roof in two minutes.

Eight questions. Each answer gets a traffic light with a plain reason, and the report adds up what your roof could hold and what to have ready for the visit.

Roof assessment checklist

8 questions · about 2 minutes · no sign-up
Example roof

We’ve filled in an example so you can see how it works: a sound metal roof facing east, about 50 m², near the sea. Change any answer to make it yours.

What is the roof made of?

Example7 good · 1 check · 0 issue · 12 panels

See report
How old is the roof, and what condition is it in?
Roof age
Condition
Which way does the main roof face?

The roof face that would carry the panels. If you’re unsure, think about which side gets the morning sun (east).

Roof slope
How much shade falls on it on a typical day?

Trees, a neighbour’s upper floor, water tanks, parapet walls and antennas all count.

Roughly how much roof could take panels?

Add up the roof faces that could carry panels. Leave out steep north faces and parts that are always shaded.

Check one face (the main one): length × width

Measure the main roof face along the slope. We check how many panels fit on it with a 1 m clear edge; any other area in your total uses the 70% allowance.

How easy is it to get onto the roof?
Who owns the roof?
How exposed is the house?

Choose the most exposed description that fits. Wind and salt air mostly change the fixings (right on the shoreline, the panels too), not whether solar works; our typhoon-ready installation guide explains what changes.

Compare with your bill (optional)

See whether the roof holds the system your bill suggests, sized the same way as our calculator’s solar-only option.

BEFORE THE VISIT

What to prepare for your site assessment

  • Your latest electricity bill, or a photo of it, so we size from your real use.
  • Clear access to your main breaker panel and meter, so we can check the wiring.
  • House plans or builder's details showing the roof framing, if you have them.
  • Roughly how far the house is from the shoreline.
  • A shaded, ventilated wall for the inverter, above any flood level you've seen.
  • Photos of the roof and your breaker panel help. You can share them when we call.

Example roof: 7 good, 1 to check on site, 0 likely issues. About 12 panels.

Estimates for planning, not a survey. Space uses our calculator’s 70% usable-roof allowance and 2.70 m² per 620 W panel. Output uses our cautious 1,350 kWh per kWp a year, reduced by the PVGIS loss for your roof direction. Photos can be shared when we call: this page doesn’t upload them.

03 · ROOF TYPE

Metal, concrete or tile: how panels are fixed.

The roof material decides the mounting, the leak protection and what we look at most closely on site.

Panel, clamped to the railRailBracket on the ribSealing washerScrew intothe purlinSteel purlin

GI, long-span, rib-type

Metal sheet roofs

Brackets bolt through the sheet into the purlins or rafters, with a sealing washer at every screw, and carry the rails. Never into the sheet alone.

  • We check: purlin size, spacing and rust, and how the sheets are fastened.
  • Standing seam: clamps grip the seams, so nothing pierces the sheet.
Panel tilted 5–15°Low steel frameWaterproofingConcrete slabAnchor bolts into the slab, each one sealed

Flat RC slab, roof deck

Concrete decks

Panels sit on low frames tilted about 5–15°, mechanically anchored into the slab rather than held down by weight or glue, with the anchors designed for the load. Every anchor passes through the waterproofing, so each one is sealed.

  • We check: the slab, its waterproofing, ceiling stains below and the drains.
  • Watch for: parapets and water tanks shading the first row.
Panel, clamped to the railHook passesbetween tilesNotched orspare tileFixed to the rafter

Clay or concrete tile

Tile roofs

Hooks fix to the rafters or battens under the tiles and come out between them, so the hook, not the tile, carries the load. Some tiles are notched or swapped for spares. Hook type and spacing follow the mounting maker’s manual.

  • We check: rafters and battens, and the condition of the tiles.
  • Watch for: brittle old tiles that crack underfoot. Keep a few spares.

Cross-sections are illustrations, not to scale. The exact brackets, hooks and anchors are specified in your proposal.

Roof types compared
Metal sheetConcrete deckTileLight materials
How panels are fixedBrackets through the sheet into purlins or raftersLow frames anchored into the slabHooks to rafters or battens, between tilesNot possible as built
Leak protectionSealing washer at every screwEach anchor sealed over the waterproofingTiles refitted over the hooks—
What we look at hardestPurlins, spacing, rust, sheet fasteningSlab condition, waterproofing, drainsRafters, battens, brittle tilesA new roof design
Usual verdictUsually straightforwardUsually straightforwardPossible, with careRebuild the roof first
  • Metal sheet

    Usually straightforward
    How panels are fixed
    Brackets through the sheet into purlins or rafters
    Leak protection
    Sealing washer at every screw
    What we look at hardest
    Purlins, spacing, rust, sheet fastening
  • Concrete deck

    Usually straightforward
    How panels are fixed
    Low frames anchored into the slab
    Leak protection
    Each anchor sealed over the waterproofing
    What we look at hardest
    Slab condition, waterproofing, drains
  • Tile

    Possible, with care
    How panels are fixed
    Hooks to rafters or battens, between tiles
    Leak protection
    Tiles refitted over the hooks
    What we look at hardest
    Rafters, battens, brittle tiles
  • Light materials

    Rebuild the roof first
    How panels are fixed
    Not possible as built
    Leak protection
    —
    What we look at hardest
    A new roof design

Not sure what’s under your roofing? That’s what the site assessment is for: we look at the frame, the fixings and the condition before anything is priced.

Request my solar roof assessment

04 · DIRECTION AND TILT

At 10° north, almost any face works.

Cebu City sits at about 10.3° N, close enough to the equator that the sun passes high overhead all year. Direction changes yearly output by a few per cent, not by half.

Compass chart of yearly solar output for Cebu City by roof direction at a 13 to 15 degree tilt, drawn from zero: south 1418, east 1387, west 1363, north 1319 and flat 1404 kilowatt-hours per kilowatt-peak.FlatSouthbestEast−2.2%West−3.9%North−7%
Petal length = yearly output, drawn from zero. Outer ring = the best angle (1,418 kWh per kWp). Flat: −1%.

Difference from the best angle, all ten runs

  1. South, 13°1,418 best
  2. South, 5°1,416 −0.1%
  3. Flat (0°)1,404 −1%
  4. South, 20°1,404 −1%
  5. East, 15°1,387 −2.2%
  6. North, 5°1,383 −2.5%
  7. West, 15°1,363 −3.9%
  8. South, 30°1,357 −4.3%
  9. North, 15°1,319 −7%
  10. North, 25°1,226 −13.5%

kWh per kWp per year. PVGIS 5.3, PVGIS-ERA5 2005–2023, 14% system loss, Cebu City. Our calculator starts from a more cautious 1,350.

South is best, by a little

A south face at about 13° gives the most in PVGIS, 1,418 kWh per kWp a year. Flat panels lose only about 1%.

East and west: about 2–4% less

East faces lose about 2%, west faces 4%. Morning and afternoon faces both work well. A gable roof facing east and west can carry panels on both sides.

North: fine when gentle

About 2% less at 5°, 7% at 15° and 14% at 25°. From about mid-April to late August the midday sun is slightly north of overhead in Cebu, part of why north faces lose so little.

Low tilt is enough

No tall frames needed: a low tilt does almost as well as the best angle and catches less wind. Many installers avoid perfectly flat panels so rain can rinse them, a matter of practice rather than a rule.

05 · SHADE

Shade costs more than a poor direction.

A gentle north slope loses a few per cent a year. A shaded panel loses most of its output for as long as the shade lasts.

Panels are wired in strings, so one shaded panel can hold back others on the same string. That is why panel makers advise against permanent shade (Jinko’s installation manual, for example, says it is “not recommended”).

When the shade falls matters as much as how long it lasts. On an idealised clear day, two hours of shade from 6 a.m. costs a shaded panel about 7% of the day’s energy; the same two hours around noon cost about 26%. Try your own shade window below.

How we handle shadeDuring the site assessment we note what casts each shadow and when, then keep panels out of it. Sometimes that means fewer panels on a better part of the roof, which usually beats more panels in shade.
7 a.m.
And lasts
Idealised clear-day solar output from 6 a.m. to 6 p.m., with shade from 7 a.m. to 9 a.m. removing about 13% of the day's energy for the shaded panels.6 am8 am10 amnoon2 pm4 pm6 pm
Illustration: an idealised clear-day curve (sunrise 6 a.m., sunset 6 p.m.). Real output also depends on weather, the panel layout and how panels are wired.

13% of a clear day’s energy

Shade from 7 a.m. to 9 a.m. costs the shaded panels about 13% of a sunny day’s output. The same 2 hours centred on noon would cost about 26%.

Trees

Mango, acacia and coconut trees keep growing. One that clears the roof today may not in five years, so ask whether it can be trimmed.

Neighbours’ upper floors

In close subdivisions, a two- or three-storey house next door can shade a bungalow roof for part of the day.

Water tanks

Elevated tanks on a roof deck cast long shadows in the morning and late afternoon.

Parapet walls

On concrete decks, parapets shade the first row when the sun is low, so frames are set back from them.

Antennas and poles

Small but sharp shadows sweep across panels during the day. Moving a dish is often easy.

06 · STRUCTURE AND AGE

Strong enough now, and in 25 years?

Panels add wind uplift to the roof, and they stay up for decades. Both are reasons to look at the frame and the roof’s remaining life before anything else.

Every bracket passes its load into the frame under the roofing, so that is where we look: the size and spacing of the purlins or rafters, how they connect to the trusses, rust on steel, termite damage in timber, and whether the roof sheets themselves are well fastened.

Replace an ageing roof first

Panels are expected to stay up for 25 years or more, so the roof under them should have at least that much life left. FEMA’s guidance, citing the US National Roofing Contractors Association, puts it plainly: the roof’s remaining service life should be at least the life of the solar system. If yours is due for replacement in the next few years, do it first. Otherwise you pay to remove and refit the panels later.

Permits and sign-off

The electrical plans for your permit must be signed and sealed by a Professional Electrical Engineer (RA 7920). Whether your city or municipality also wants a building permit or a structural sign-off for rooftop solar varies, and we confirm it for your address.

Typhoons: the fixings fail first

In FEMA’s study after the 2017 hurricanes in the US Virgin Islands, whole rows of panels were lost when clamps and their bolts let go, while the mounts themselves held. So the fixing method, the clamp hardware and the wind design for your site matter more than the panel’s datasheet. Our typhoon-ready installation guide covers wind design, coastal corrosion and what to do before and after a storm.

What we check on the structure

During the site assessment, before any final price.

  1. Purlin or rafter size, spacing and condition
  2. How purlins connect to the trusses, and how the sheets are fastened
  3. Rust and corrosion, especially near the sea
  4. Termite or rot damage in timber
  5. Leaks and stains on the ceiling below
  6. Clear strips at eaves, ridges, gables and corners
  7. Where cables enter the house, and how they’ll be sealed

07 · ACCESS AND UPKEEP

Room to work, for the next 25 years.

A roof that’s hard to reach is hard to install on and hard to look after. These are the practical checks people forget.

Safe access

Installers need stairs to the deck or a safe ladder spot. Three-storey homes and steep roofs may need scaffolding or anchor points; we tell you during the assessment if they’re needed.

Walkways and gaps

Gaps between rows leave room to reach every clamp for yearly checks without stepping on panels.

Cleaning

Rain rinses panels for much of the year. In dry spells, dust and bird droppings build up; a rinse with water from a safe position is usually enough. Never walk on panels.

Drains and gutters

Panels should never cover roof drains or gutters, so water still gets away in a downpour and you can still clear them.

A spot for the inverter

Deye’s SG05LP1 datasheet lists IP65 and output derating above 45 °C, so the inverter goes on a shaded, ventilated wall, with the battery, above any flood level.

08 · PERMISSION

Townhouses, apartments and rented homes.

The roof has to be yours to change, or someone has to agree in writing. Sort this out before the site visit.

A

Townhouse or subdivision home

You usually own your roof, but your homeowners’ association may have rules on roof works, appearance or contractors’ working hours. Check them early.

B

Apartment or condominium

In most buildings the roof is common property, so you need written approval from the building owner or condominium corporation, a roof area assigned to you and a safe cable route to your own meter.

C

Renting

Solar is fixed to the building, so the owner must agree in writing. Net-metering applications can also ask for proof of ownership: Visayan Electric lists it among its application documents.

09 · YOUR UTILITY

The roof isn’t the only limit: so is your transformer.

Every home connects to a neighbourhood transformer, and utilities cap how much solar each one can host. VECO and MECO publish guide tables at about 30% of a transformer’s rating, so a 25 kVA transformer hosts about 7.5–8 kW of solar. CEBECO I uses 40%.

VECO now also publishes capacity by substation and feeder. Its table dated 15 October 2026 shows 11 of its 65 listed feeders with no remaining capacity. So the utility’s impact study, free to the customer, decides what can be connected and exported at your address. Our net-metering guide explains the application, and the utility guides cover each area.

≈30%VECO and MECOof a transformer’s kVA, guide tables

40%CEBECO Iof a transformer’s kVA

11 of 65VECO feeders at 0 MWtable dated 15 Oct 2026

₱0impact study feeERC net-metering rules, 2025

10 · THE SITE ASSESSMENT

What happens when we check your roof.

From your desk to a final design, in four steps. Nothing is priced as final until the roof and wiring have been seen.

Your roof assessment, step by step

01 / 04
Your roof, assessedA visual guide
Today the home runs on the grid and the roof is bare.
  • Sunlight
  • Grid
Illustration

Chapter 01

Step 1 · From your desk

Your bill, your address and a first look at the roof.

Start with this checklist and our calculator. Where Google has data for your address, the calculator reads Google’s Solar API estimate of your sunny roof area; elsewhere you can draw your roof on the map or type in its size. Your bill sizes the system before anyone climbs a ladder.

We take care of
Sizing from your bill, a first panel count and an itemised estimate.
Your part
Your latest bill, your address and the checklist answers.

A first design and price range before the visit.

At your pace. Select any chapter.

Ready for step 2? We’ll call to arrange the visit, and you can share roof photos then.

Request my solar roof assessment

Scenes are illustrations, not photos of an installation. See the whole journey on how solar works, or browse all our solar guides.

STRAIGHT ANSWERS

Roof questions, answered straight.

Common questions about roofs, with the numbers behind the answers.

01Can solar panels go on a GI or long-span metal roof?

Yes. Metal sheet roofs are among the simplest to mount on. Brackets fix through the sheet into the purlins or rafters with a sealing washer at each screw, never to the sheet alone, and the rails and panels sit on those brackets. During the site assessment we check purlin size, spacing and rust, and how the sheets themselves are fastened.

On standing-seam roofs, clamps can grip the seams instead, so nothing pierces the sheet.

02Will solar panels make my roof leak?

They shouldn’t, as long as every fixing is sealed. On metal roofs each screw gets a sealing washer; on concrete decks each anchor is sealed over the waterproofing; on tile roofs the hooks pass between tiles that are put back over them. Leaks usually come from fixings that miss the purlin, unsealed penetrations or panels laid over drains.

If your roof already leaks, fix it before installation. Repairs under an array mean taking panels off.

03Is a north-facing roof OK for solar in Cebu?

Usually, yes. In PVGIS data for Cebu City, a north face tilted 15° gives about 7% less a year than the best angle, and at 5° only about 2% less. Steep north faces lose more: about 14% at 25°. If you have a free east, west or south face we’d use that first, but a north face is often still worth it.

04What angle should solar panels be at in the Philippines?

At Cebu’s latitude a south-facing tilt of about 13° gives the most energy in PVGIS (1,418 kWh per kWp a year), but anything from flat to about 20° is within about 1% of it. On sloped roofs panels simply follow the roof. On flat concrete decks we use low frames of about 5–15°: tall frames gain almost nothing here and catch more wind.

05Solar panel sa bubong ng bahay: what if our roof is already old?

Check how much life it has left first. Panels stay up for 25 years or more, and the roof under them should last at least as long. If the roof leaks, sags, is badly rusted or is due for replacement in the next few years, replace it before installing; otherwise you pay to remove and refit the panels later.

Our site assessment checks the roof’s condition before any price is final.

06Which roofs are not suitable for solar?

Roofs in shade for most of the day, roofs built from light materials such as nipa or thin board, roofs near the end of their life, and very small roofs with room for fewer than 4 panels once the edges are kept clear. Within about 50 m of the shore the design changes: some panel makers (Jinko, for example) set 50 m as their minimum distance and recommend marine-rated modules closer in. A shared or rented roof works only with the owner’s written permission.

07Can I install solar on a townhouse, apartment or condo?

On a townhouse you usually own your roof, but check your homeowners’ association rules first. In most apartment buildings and condominiums the roof is common property, so you need written approval from the building owner or condominium corporation, a roof area assigned to you, and a cable route to your own meter. If you rent, the owner must agree in writing, and net-metering applications can ask for proof of ownership.

08How much roof space do I need for solar?

As a planning figure, about 6.2 m² of open roof per kWp. A ₱10,000 monthly VECO bill (₱14.89/kWh, Sep 2026) suggests about 7 panels, or roughly 27 m² of roof. Small, hipped or cut-up roofs fit fewer panels once a clear edge of about a metre is kept, so we confirm the count with a drawn layout during the site assessment.

ROUTES B & C · TALK TO US

Prefer a quote or a conversation?

Every quotation follows a site assessment of your roof, wiring and priorities, so the price you approve is the price of the system you get.

Request a roof assessment

Tell us where the house is and what the roof is like. We’ll call to arrange a visit, and you can share roof photos then.

Request a roof assessment

No payment and no obligation. We only use your details for this enquiry.

Ask a solar advisor

Not ready for a quote? Ask about whether your roof suits solar and we’ll reply by phone or email.

Ask a solar advisor

No payment and no obligation. We only use your details for this enquiry.

ROUTE A · INSTANT ESTIMATE

Get your own estimate.

The same calculator and prices as the rest of the site. Your estimate stays on your screen unless you ask us to contact you.

Have a promo code?

Your promo code takes 10% off your system estimate, up to ₱50,000.

Let’s start with your electricity bill.

Choose your usual monthly bill. An estimate is all you need.

Using VECO at ₱14.89/kWh · Sep 2026. You can change your provider later.

About 30 seconds · No obligation

Sources & assumptions

Reviewed 16 October 2026 · Panel counts and output recalculated from our calculator’s maths; VECO rate ₱14.89/kWh (Sep 2026)

  1. EU JRC, PVGIS 5.3: Cebu City yield by direction and tilt (run 16 Oct 2026) (opens in a new tab)

    Grid-connected PV run for 10.3157° N, 123.8854° E, PVGIS-ERA5 2005–2023, 1 kWp, 14% system loss. Optimum 1,418 kWh/kWp at 13° south; ten orientations compared.

  2. FEMA, USVI Recovery Advisory 5: Rooftop Solar Panel Attachment (Apr 2018, rev. Aug 2018; copy hosted by Enphase) (opens in a new tab)

    Clamp failures, through-fixing to the structure, no ballast-only systems in hurricane regions, roof service life, walkways, drains and yearly clamp checks.

  3. JinkoSolar, Installation manual for PV modules v23.12.10 (Dec 2023; copy hosted by distributor Memodo) (opens in a new tab)

    One major manufacturer’s manual, cited as an example of coastal and shading rules: permanent shading not recommended; 50 m minimum from the seashore and connector protection from 50 to 500 m. Your proposal names the actual module and its manual.

  4. Deye, SUN-3.6/5/6/7/7.6/8/10K-SG05LP1 datasheet (Sep 2026) (opens in a new tab)

    IP65; output derates above 45 °C.

  5. SkyCiv, NSCP 2015 wind load calculations (updated 4 Sep 2026) (opens in a new tab)

    NSCP 2015 wind provisions are based on ASCE 7-10. The ~1 m clear edge is our estimate from ASCE 7-10 edge-zone widths for a typical house; the engineer’s calculation decides.

  6. Visayan Electric, hosting capacity guide table (undated) (opens in a new tab)

    About 30% of transformer kVA, e.g. 25 kVA → 7.5 kW. For initial guidance only.

  7. Visayan Electric, hosting capacity per substation and feeder (doc. VE-PSPD-REG-20261015-03, 15 Oct 2026) (opens in a new tab)

    11 of the 65 listed 23 kV feeders at 0.00 MW.

  8. MECO, hosting capacity (29 Jan 2026) (opens in a new tab)

    About 30% of transformer kVA for single-phase transformers without PV.

  9. CEBECO I, What is Net-Metering Program (PDF, 16 Sep 2025) (opens in a new tab)

    Hosting table at 40% of transformer kVA.

  10. ERC Resolution 15 s.2025, Amended Net-Metering Rules (copy hosted by Visayan Electric) (opens in a new tab)

    Distribution impact study at no cost to the customer.

  11. Visayan Electric, net-metering application (undated) (opens in a new tab)

    Documents listed include IDs and proof of ownership.

  12. DILG–DPWH–DOE JMC 001 s.2026 on net-metering permits (13 Jan 2026) (opens in a new tab)

    RE facilities built without a building permit must secure one first (§5.1, §6). Cebu LGU practice for rooftop PV not yet confirmed.

  13. Republic Act 7920, New Electrical Engineering Law (24 Feb 1995) (opens in a new tab)

    Electrical plans must be signed and sealed by a Professional Electrical Engineer (Sec. 31, 34).

YOUR ROOF, CHECKED

Find out what your roof
can really hold.

A site assessment measures every face, maps the shade and checks the structure and wiring, so the quote you approve fits your actual roof. No obligation.

A Cebu house with rooftop solar panels keeps its lights on during a brownout

A brighter beginning
for your home.

THE INTRO OFFER

A little sunshine.
A little extra saving.

Get up to
₱50,000 off

10% off your estimated installed system price, up to ₱50,000. Final pricing follows a site assessment.